Case History
TREVISO-CONEGLIANO: Lot 29, Highway 28
A MEASUREMENT OF HIGHWAY
Grating welded railings, mesh 63x66, 25x3 dish, designed one by one (with advantages in terms of aesthetics and speed of installation) to accompany the curvature of the branches of the junction, and drains (Watertrap) equipped with slots for water collection filtered by gaps of draining pavement. These are only some of the technologically advanced solutions provided by GRIDIRON to CMB, the company executing the batch 29 of the motorway A28.












